The surface must be smooth ,clean and dry ,free from dust,oils grease and other debris. The surface is then treated with bituminous primer (EXTRALAC PRIMER at a consumption of 0.2-0.25 kg/m²) or with elastomeric bituminous primer (ELASTOLAC at a consumption of 0.3-06 kg/m²) and allowed to dry at least for 24 h before the application of the membrane. As an alternative bituminous emulsion EXTRACOAT can be used at a consumption of 0.5-1 Kg/m² or EXTRACOAT RUBBER at a consumption of 0.5-1 kg/m².
The membrane is unrolled on the dry primer coating and aligned before it is rolled back. The membrane is unrolled again while the lower surface is heated and especially the primer by means of a propane gas torch, until the polyethylene film starts to melt , ensuring the adhesion of the membrane to the substrate. Side laps must be at least 10 cm and end laps 15 cm. When the bonding of the roll is completed we torch the overlaps taking care not to weaken them by extreme heating and by means of a trowel we press to achieve good bonding.If we want to strengthen up the overlaps or other sensitive points on the roof (ventilators,drains,upstands,etc),we can apply bituminous sealants Masticgum No1 or Masticgum No2 (for horizontal or vertical surfaces respectively) which should prodect from sun radiation with one or more layers of bituminous aluminium paint ALUCOAT. In a multi layer system the first layer can be applied as loose laid, partially attached or fully adhered. The subsequent layers must always be fully adhered.
During the application care must be taken so that the overlaps of the subsequent layers to not coincide with the overlaps of the previous layer.
The roll dimensions are 10m long and 1m wide (other rolls dimensions are available on request).The rolls are supplied on wooden pallets and are held in position by a heat shrunk plastic bag.